news

MSW in the Port of Leixões

Date

16 January 2025

Category

share

MSW in the Port of Leixões

16 January 2025

The project to expand the northern quay of dock no. 1 and widen its RO-RO ramp at the Port of Leixões is underway.

The port will benefit from a new quay with a single berthing front, measuring 450 m in length. The existing Ro-Ro ramp, with a beam of 22 m, will be widened to 36 m, allowing larger vessels to operate. Furthermore, the quay will be equipped with runways to enable the operation of ship-to-shore (STS) cargo movements using quayside gantries. The detailed design of this project was conducted by MSW, a Norvia Group company specializing in maritime works.