In the image, a well 23 meters deep and 45 meters diameter executed through NATM vertical method. This is where the new Manuel Leão subway station will be built in Oporto.
LCW designed the excavation and structures integrating the design consortium appointed for the Yellow Line extension project of Metro do Porto.