The contract for “Construction of a Pier in the Port of Lajes das Flores” is in progress, a project promoted by Portos dos Açores, SA This is the second contract for the emergency works carried out in that port infrastructure after the damage caused by Hurricane Lorenzo in October 2019. The first contract, still in progress, aims to guarantee emergency protection to the port embankment and access to the port.
MSW is responsible for the design and technical assistance during construction, which also include the construction of a Ro-Ro ramp, dredging and pavement repair on the access road.