The construction, that started back in 2007, was suspended a couple of times until it came back in full force – its relevance was recognized by Brussels, since it was the only construction that had the European Union’s support to be concluded.
NRV Norvia was responsible for the design and for the technical assistance during the construction. The highway, with 2,5 km, has a double tunnel and three important viaducts. Take off and take a look at the works clicking the video.