Road between Bofareira and the existing road between Sal-Rei and Rabil with a length of 9,2 km and a 1x1 lane profile, with 0,5 m + 3 m + 3 m + 0,5 m. Works included earthworks, basaltic stone masonry, drainage, paving and signaling (vertical and horizontal). They were performed 29 hydraulic passages in metal and concrete box culvert-type with sections ranging from 1 to 3 meters and retaining walls in mortared local stone. Excavated approximately 58.300 m3, performed 54.400 m3 of landfill, placed about 14.000 m3 of tout-venant base layer with 20 cm, and placed 67.374 m2 of asphalt wear layer with 5 cm thick.
Supervision, quality control and geometric control.