Project
Category
Client
Location
Services year
Construction value
share
Project
Category
Client
Location
Services year
share
The Detailed Plan goals are:
a) Urban and environmental qualification of an area with high environmental sensitivity;
b) Morphological integration of adjacent urban areas;
c) Minimizing the barrier effects of road links in the regional network and the local network.
The area of ??intervention of 'Senhor do Roubado' Interface Detail Plan corresponds to the entire SubUOPG 04 area of ??the PDM of Odivelas, delimited in the Scheme Director of UOPG 03 - Odivelas Regional Road Node and according to the study developed for the respective management unit. It is an area with a transport interface of great importance, on the outskirts of Lisbon, which includes a metro station, a bus terminal and large car parking areas. The Plan proposes the creation of a parking silo and a large commercial area, as well as the demolition of degraded buildings.
Considering the characteristics of Sub-UOPG 04's territory, its location has a great dynamic of circulation, with a large area still to be consolidated, it is important to ensure that it results in a space with a positive impact and qualifies this territory.
Land use planning, urbanism, road and transport network, acoustic studies, strategic environmental assessment.