Project
Category
Client
Location
Services year
Construction value
share
Project
Category
Client
Location
Services year
share
ER223 road connection between Jardim do Mar and Estreito da Calheta, 1.880 m long, consisting of the Jardim do Mar Tunnel 1050 m (Phase A) and a Prestressed Concrete Structure, supported on the side of the slope and over the road to protect from rockfall with an approximate length of 550m (Phase B).
Preliminary Solutions, Detailed Design and Technical Assistance during Construction (Phase A and B)