Project

ROAD LINK TO JARDIM DA SERRA

Category

Road infrastructure, Tunnels

Client

AFAVIAS / Tecnovia / SRES - Regional Secretariat of Social Equipment and Tansportation

Location

Madeira Island, Portugal

Services year

2011

share

ROAD LINK TO JARDIM DA SERRA

Road infrastructure, Tunnels

The project involved the construction of 3 tunnels with 1 x 2 lanes, with 215 m, 1.250 m and 1.150 m of total length each. Development of studies in geotechnics/structures of tunnels and types of portals, as well as engineering services in earthworks, drainage, pavements, signing, concrete structures, special structures, lighting and ventilation.

Provided services

Preliminary design, detailed design, site investigation and technical assistance.