news

Expansion of TAP's maintenance hangar platform

Date

10 June 2026

Category

share

Expansion of TAP's maintenance hangar platform

10 June 2026

TAP has inaugurated the expansion apron serving its main maintenance hangar (Hangar 6). NRV was responsible for the preliminary study and detailed design — as well as for providing technical support during the construction phase.

The new facility adds approximately 9,500 m² of operational space, enabling up to four aircraft to be positioned simultaneously. It features a large-scale gate that separates airside and landside operations while also deflecting jet blast from aircraft operating in the vicinity of the apron.