Rehabilitation of the road connecting Kaédi to Selibaby. Total extension of the project of 257 km.
Lot 1 (Kaédi - M'Bout and Foum-Gleita): road with 116 km long, between the villages of Kaédi and M'Bout, as well the variant to Foum-Gleita Dam in a distance of 24 km, including the completion of 6 bridges and 118 hydraulic passages in reinforced concrete.
Lot 2 (M'Bout - Selibaby - Gouraye): axis M'Bout / Selibaby with 117 km long, comprising 8 bridges and 14 hydraulic passages in reinforced concrete, and construction of the section between Selibaby and Gouraye. This last section has a length of 45 km and includes 2 bridges and 76 reinforced concrete hydraulic passages.
This project is financing from European Union.
Detailed design and technical assistance, including quality control and geometric control.